by Burke Construction Group | Mar 16, 2019
A 4,606 square foot tenant improvements for FDM4, which included a highly customized interior as well as a wet bar, custom toilet and custom sink in the owner’s office. Customized interior finishes included beautiful marble flooring, full glass walls and doors as well as custom cabinetry and sinks. Additional scope features consisted of electrical and plumbing work as well as hard lids soffits throughout space.
by Burke Construction Group | Mar 16, 2019
In 2012 we completed a 13,132 square foot tenant improvement which consisted of interior design, framing, electrical, mechanical and plumbing finishes as well as extensive security upgrades. In 2016 we completed an 8,058 square foot expansion for William Hill Gaming. The expansion included demolition to part of the existing suite as well as the suite receiving all new flooring, HVAC, interior walls, ceiling, electrical, doors and paint.
by Burke Construction Group | Feb 12, 2019
This 28,500 square foot project consisted of converting a warehouse space into an FDA and Nevada Health Department certified food processing facility that produces Aloha Shoyu’s world famous teriyaki and soy sauces. Improvements consisted of the installation of a gas boiler, trench drains, high-pressure distribution lines, electrical and gas distribution systems. A 10,000 square foot “clean room,” unistrut ceiling structure and full epoxy flooring were also installed.
by Burke Construction Group | Dec 30, 2018
The Sykes Call Center is located in the Cheyenne Corporate Center and acts as technical support for the Sony Customers. The scope of this project included the complete demolition of an existing 43,000 square foot tenant improvement. The new space included a new UPS system, state of the art lighting package, extensive tenant specified vinyl branding and a 1,100 square foot cafe/break area. A unique feature of this project was the use of 3form wall panels hung from airplane cable.
by Burke Construction Group | Dec 30, 2018
Construction of the newest phase of tenant improvements for Tesla at Town Square, Las Vegas. The project space consisted of 44,250 square feet of space and included a full tenant improvement build out of all mechanical, electrical, plumbing and sound masking systems as well as low voltage features and flooring. This project also consisted of a multi-phased tenant improvement project for two adjacent second-floor suites totaling 113,250 square foot space. These phases also included new flooring, modular furniture, custom millwork and lighting finishes which created a modern and sustainable appearance.
2015 Safe Sight Award
AGC Las Vegas